Ohop Valley Restoration: September 1st-15th Construction Photos


Once a week we all get together to review progress and discuss issues that may arise

Once a week we all get together to review progress and discuss issues that may arise

Dr. Tim Abbe offers insght into Log jam design to Brian Combs (SPSSEG) and Monica Hoover (NRCS)

Dr. Tim Abbe offers insght into Log jam design to Brian Combs (SPSSEG) and Monica Hoover (NRCS)

The manure lagoon, originally scheduled for demolition this summer will be decommissioned Spring and Summer of 2010.

The manure lagoon, originally scheduled for demolition this summer will be decommissioned Spring and Summer of 2010.

Log Jam Build

Log Jam Build
Extra Ballast being added to log jam just upstream of Highway 7 bridge

Extra Ballast being added to log jam just upstream of Highway 7 bridge

Pounding in pilings during log jam installation

Pounding in pilings during log jam installation

Erosion Control Balnket as well as native grass and emergent seeds are being installed along all of the banks to prevent sloughing of sediment.

Erosion Control Balnket as well as native grass and emergent seeds are being installed along all of the banks to prevent sloughing of sediment.

Information and Links

Join the fray by commenting, tracking what others have to say, or linking to it from your blog.


Other Posts
Kennedy Creek Salmon Trail Opens this Saturday!
Dewatering and Fish Removal at Highway 7 Bridge

Write a Comment

Take a moment to comment and tell us what you think. Some basic HTML is allowed for formatting.

Reader Comments

Be the first to leave a comment!